Toggle menu

Falkirk Road, Linlithgow - Footpath Closure (Monday 29 Sep)

Falkirk Road footpath will be closed outside Aldi between number 51 and pedestrian crossing for installation of cable for EV charger

When will this take place?

  • The closure will be in place from 9am on Monday 29 September until 4pm on Monday 6 October

Diverted to North Footway Via a Temporary Pedestrian Crossing & Existing Pedestrian Crossing

Map of footpath closure

Map of footpath closure Falkirk Road, Linlithgow