Road Closures Commencing in February
Road closures and diversions planned to start in February.
The A89 Edinburgh Road will be closed at the railway arches under the bridge for repair work. Work will take place from 10pm to 6am each night.
The parking bays outside M&Co on High Street, Linlithgow will be suspended for Scottish Water works
The School Road Longridge will be closed near to 2 Easter Longridge Crofts for duct work
The Golf Course Road, Linlithgow will be closed from Braehead Terrace to the Golf Club Entrance for Essential cleaning of flood flumes within the road as part of the Flood Prevention Scheme.